{"id":1796,"date":"2022-06-21T11:16:21","date_gmt":"2022-06-21T11:16:21","guid":{"rendered":"https:\/\/medusascs.com\/?post_type=news&#038;p=1796"},"modified":"2025-02-03T10:37:57","modified_gmt":"2025-02-03T10:37:57","slug":"altice-portugal-meo-signs-mou-with-medusa-for-the-landing-at-carcavelos-lisbon","status":"publish","type":"news","link":"https:\/\/medusascs.com\/fr\/news\/altice-portugal-meo-signs-mou-with-medusa-for-the-landing-at-carcavelos-lisbon\/","title":{"rendered":"Altice Portugal (MEO) signs MOU with Medusa  for the landing at Carcavelos (Lisbon)"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-1797 size-large\" src=\"https:\/\/medusascs.com\/wp-content\/uploads\/2024\/06\/IMG_0018-1024x683.jpg\" alt=\"Alexander Freeze and Norman Albi\" width=\"1024\" height=\"683\" srcset=\"https:\/\/medusascs.com\/wp-content\/uploads\/2024\/06\/IMG_0018-1024x683.jpg 1024w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/06\/IMG_0018-300x200.jpg 300w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/06\/IMG_0018-768x512.jpg 768w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/06\/IMG_0018-1536x1024.jpg 1536w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/06\/IMG_0018-2048x1365.jpg 2048w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/06\/IMG_0018-18x12.jpg 18w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p><strong>Marseilles, 21 June 2022<\/strong>.\u00a0 Medusa Submarine Cable System, the Mediterranean Subsea Infrastructure Operator, and MEO (Altice Portugal), Portugal&#8217;s telecommunications leader, have signed an MoU (Memorandum of Understanding) defining the guidelines for the Medusa landing in Carcavelos, in the municipality of Cascais (Lisbon district). The agreement was signed during the Subsea World 2022 in Marseille by Managing Director and CEO of AFR-IX telecom \u2013 the company sponsoring Medusa &#8211; Norman Albi and the COO of Altice Portugal, Alexander Freese.<\/p>\n<p>The Carcavelos landing station will be the western point of the more than 8,700 km route of Medusa, the longest submarine cable in the Mediterranean that will link 9 countries in Africa and Europe through its landing points located in Portugal, Morocco, Spain, France, Algeria, Tunisia, Italy, Greece, Egypt and Cyprus.<\/p>\n<p>&nbsp;<\/p>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">\n<blockquote>\n<div class=\"su-quote-inner su-u-clearfix su-u-trim\">The Portuguese coast has always been strategic to generate connections, as it is the gateway to the Atlantic and West Africa. It was decisive for Medusa that the start of its route was Portuguese and Carcavelos offers optimal conditions for this<\/div>\n<div class=\"su-quote-inner su-u-clearfix su-u-trim\"><span class=\"su-quote-cite\"><a href=\"https:\/\/www.linkedin.com\/in\/normanalbi\/\" target=\"_blank\" rel=\"noopener\">Norman Albi, CEO of Medusa<\/a><\/span><\/div>\n<\/blockquote>\n<\/div>\n<p>&nbsp;<\/p>\n<blockquote>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">Altice Portugal, as the leader of the communications sector in Portugal, is proud to help create a gateway to Europe of such relevant assets in the communications sector as Medusa, also reinforcing its commitment to the global economy<\/div>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">Alexander Freese, Head of Wholesale<\/div>\n<\/blockquote>\n<div>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">\n<div>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">\n<h2 class=\"su-quote-inner su-u-clearfix su-u-trim\">Medusa will arrive in Carcavelos in 2024<\/h2>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div>\n<p>Medusa is a project involving a total investment of \u20ac326 million. The cable, which will be built by Alcatel Submarine Networks (ASN), will have segments housing up to 24 fibre pairs with a capacity design of 20 Tbit\/s per fibre pair.<\/p>\n<p>The agreement with MEO (Altice Portugal) will enable the first Medusa segment linking the cities of Cascais-Lisbon (Carcavelos landing station), Barcelona and Marseille to become a reality. AFR-IX expects the cable to reach Carcavelos during the second quarter of 2024.<\/p>\n<p>In addition to the know-how and infrastructures provided by Altice Portugal, Medusa&#8217;s future customers will be able to benefit from the connection between the Carcavelos Cable Landing Station and the company&#8217;s most recent investment, the new international co-installation and interconnection centre in Linda-a-Velha, Lisbon (Altice LDV).<\/p>\n<p>In this partnership project with Medusa, Altice Portugal will ensure landing services for the submarine cable, including ducts from the beach to the station, space and power at the CLS, operation and maintenance services, and connectivity between the station and other international reference points in Portugal and beyond, namely data centres, other submarine cable stations and teleports.<\/p>\n<\/div>\n<div>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">\n<div>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">\n<div>\n<p>&nbsp;<\/p>\n<h3>About Altice Portugal (MEO)<\/h3>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"su-quote su-quote-style-default su-quote-has-cite\">\n<p>Market leader, <a href=\"https:\/\/www.altice.pt\/pt\" target=\"_blank\" rel=\"noopener\">Altice Portugal<\/a> operates in all segments of the ICT sector: fixed, mobile, television, multimedia, data, advertising, data center and cloud, as well as business and wholesale solutions and submarine cable infrastructures providing an integrated telecommunication offering with Telco, ICT and BPO.<\/p>\n<p>Altice Portugal is part of Altice Europe, an international group strongly anchored in robust infrastructure with high quality, with a clear content strategy and innovative offers of converged telecommunications services.<\/p>\n<\/div>\n<\/div>","protected":false},"featured_media":1797,"parent":0,"template":"","tax-news":[],"class_list":["post-1796","news","type-news","status-publish","has-post-thumbnail","hentry"],"_links":{"self":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/news\/1796","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/media\/1797"}],"wp:attachment":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/media?parent=1796"}],"wp:term":[{"taxonomy":"tax-news","embeddable":true,"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/tax-news?post=1796"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}