{"id":2080,"date":"2025-10-08T12:47:30","date_gmt":"2025-10-08T12:47:30","guid":{"rendered":"https:\/\/medusascs.com\/?post_type=news&#038;p=2080"},"modified":"2025-10-10T13:07:58","modified_gmt":"2025-10-10T13:07:58","slug":"medusa-lands-in-marseille","status":"publish","type":"news","link":"https:\/\/medusascs.com\/fr\/news\/medusa-lands-in-marseille\/","title":{"rendered":"Medusa Submarine Cable System Lands in Marseille"},"content":{"rendered":"<h1>Medusa Submarine Cable System Lands in Marseille, Marking the Start of its Mediterranean Deployment<\/h1>\n<p><strong>Marseille, October 8, 2025.<\/strong> Medusa, the submarine fiber optic cable system owned by <a href=\"http:\/\/www.afr-ix.com\" target=\"_blank\" rel=\"noopener\">AFR-IX Telecom<\/a>, landed this morning at the cable landing station in Marseille. This marks Medusa\u2019s first landing and represents a major milestone in the cable\u2019s rollout across the Mediterranean.<\/p>\n<p>The initial segment of Medusa will link Marseille with Bizerte (Tunisia) and Nador (Morocco), with landings expected between late October and December. This will be followed by the deployment of the remaining landings throughout 2026, ensuring the progressive expansion of the system across the region. This first connection between the two shores of the Mediterranean brings to life Medusa\u2019s ambitious vision: deploying over 8,700 km of submarine cable to interconnect Southern Europe and North Africa, with 19 landings.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-large wp-image-2082\" src=\"https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/P1077867-1024x683.webp\" alt=\"Medusa lands in Marseille\" width=\"1024\" height=\"683\" srcset=\"https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/P1077867-1024x683.webp 1024w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/P1077867-300x200.webp 300w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/P1077867-768x512.webp 768w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/P1077867-1536x1024.webp 1536w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/P1077867.webp 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/p>\n<p>The system will feature segments with up to 24 fiber pairs, each offering a capacity of 20 Tbit\/s. The first phase will be ready for service at the beginning of 2026.<\/p>\n<p>Norman Albi, CEO of AFR-IX Telecom and Medusa, highlighted the significance of this first landing:<\/p>\n<p>\u201c<em>By bringing Medusa to Marseille, one of Europe\u2019s leading digital hubs, we are laying the foundation for a project that will transform communications between Europe and Africa. Medusa will act as a driver of economic growth for the region and a catalyst for knowledge exchange across the Mediterranean<\/em>.\u201d<\/p>\n<p>The choice of Marseille as the first landing point was strategic: its location has made it a major hub for data centers and a key node for submarine cable interconnections.<\/p>\n<p>This important milestone has been co-financed by the European Union through the Connecting Europe Facility (CEF) program, under the AFR-IX projects <a href=\"https:\/\/medusascs.com\/fr\/digital-gateway-between-the-atlantic-and-the-mediterranean\/\" target=\"_blank\" rel=\"noopener\">ATMED \u2013 DG<\/a> et <a href=\"https:\/\/medusascs.com\/fr\/digital-gateway-between-the-atlantic-and-the-mediterranean-nador\/\">ATMED Nador &#8211; DG<\/a> projects, which aim to strengthen connectivity between Europe and North Africa.<\/p>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-2083 size-medium\" src=\"https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-08-at-12.46.53-225x300.webp\" alt=\"co-funded by the European Union\" width=\"225\" height=\"300\" srcset=\"https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-08-at-12.46.53-225x300.webp 225w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-08-at-12.46.53-768x1024.webp 768w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-08-at-12.46.53-1152x1536.webp 1152w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/WhatsApp-Image-2025-10-08-at-12.46.53.webp 1200w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/p>\n<h2>Medusa: A Corridor Between the Mediterranean, Atlantic and Red Sea.<\/h2>\n<p>Medusa is a neutral and independent submarine cable system that will connect 12 countries across North Africa and Southern Europe \u2014 Portugal, Morocco, Spain, France, Algeria, Tunisia, Italy, Malta, Libya, Greece, Cyprus, and Egypt \u2014 through a phased deployment across its various landing points.<\/p>\n<p>Beyond connecting both shores of the Mediterranean, Medusa will also serve as a corridor linking the Mediterranean to the Atlantic Ocean (with a landing in Portugal) and to the Red Sea (via Aqaba, Jordan).<\/p>\n<p>The Medusa project represents a total investment of \u20ac342 million. While it is a private initiative, its strategic importance has attracted significant public funding. The European Union has allocated \u20ac38,3 million through the CEF program.<\/p>\n<p>Additionally, the project has received \u20ac40 million from the European Investment Bank (EIB) to support G\u00c9ANT, an initiative aimed at ensuring connectivity between national research and education networks in the EU Southern Neighbourhood region (North Africa).<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-2085 size-medium\" src=\"https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/EN-Co-funded-by-the-EU_POS-300x63.webp\" alt=\"co funded by the EU\" width=\"300\" height=\"63\" srcset=\"https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/EN-Co-funded-by-the-EU_POS-300x63.webp 300w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/EN-Co-funded-by-the-EU_POS-1024x215.webp 1024w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/EN-Co-funded-by-the-EU_POS-768x161.webp 768w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/EN-Co-funded-by-the-EU_POS-1536x322.webp 1536w, https:\/\/medusascs.com\/wp-content\/uploads\/2025\/10\/EN-Co-funded-by-the-EU_POS.webp 1920w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>PSI project reference PLEC2021-007875 funded by the Spanish Ministry of Science and Innovation MCIN\/AEI\/10.13039\/501100011033 and by the European Union NextGenerationEU\/PRTR program.<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1293 size-medium aligncenter\" src=\"https:\/\/medusascs.com\/wp-content\/uploads\/2024\/03\/Captura-de-pantalla-2024-03-26-a-las-17.19.18-300x70.webp\" alt=\"PSI project\" width=\"300\" height=\"70\" srcset=\"https:\/\/medusascs.com\/wp-content\/uploads\/2024\/03\/Captura-de-pantalla-2024-03-26-a-las-17.19.18-300x70.webp 300w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/03\/Captura-de-pantalla-2024-03-26-a-las-17.19.18-1024x237.webp 1024w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/03\/Captura-de-pantalla-2024-03-26-a-las-17.19.18-768x178.webp 768w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/03\/Captura-de-pantalla-2024-03-26-a-las-17.19.18-1536x356.webp 1536w, https:\/\/medusascs.com\/wp-content\/uploads\/2024\/03\/Captura-de-pantalla-2024-03-26-a-las-17.19.18-2048x474.webp 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/p>","protected":false},"featured_media":2082,"parent":0,"template":"","tax-news":[33],"class_list":["post-2080","news","type-news","status-publish","has-post-thumbnail","hentry","tax-news-featured"],"_links":{"self":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/news\/2080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/news"}],"about":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/types\/news"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/media\/2082"}],"wp:attachment":[{"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/media?parent=2080"}],"wp:term":[{"taxonomy":"tax-news","embeddable":true,"href":"https:\/\/medusascs.com\/fr\/wp-json\/wp\/v2\/tax-news?post=2080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}